321

BIOROCK-L Installation in Reading

BIOROCK-L Installation in Reading

Location

Wokingham, Reading

Project

Horticultural Farm with resident on-site workers.

System

BIOROCK-L Gravity System with ST2-3000 Primary Tank & BIOROCK-L Treatment Unit with 160mm Aeration Chamber.

Background

The existing septic tank was overloaded and was discharging to ground. With the addition of new staff the a new system was required. The client had previously installed an electric system on another part of the farm which had proven to be very expensive to install, run and maintain. He was attracted to BIOROCK due to ease of installation, no running costs and little maintenance and the fact that he could discharge the treated effluent to a nearby ditch/stream.

Installation

The existing pipework into and from the septic tank was used to connect to the BIOROCK System. Installation was carried out by the client's staff under the supervision of a BIOROCK Engineer and was completed in less than 2 days.

Chcesz się z nami skontaktować?

Witam, mam na imię José Manuel Rodríguez , International Sales Director BIOROCK. Skontaktuj się z nami teraz, aby uzyskać BEZPŁATNĄ ocenę projektu.

Gdzie się znajdujesz?

POWIEDZ NAM COŚ WIĘCEJ O SOBIE

Aby się z Tobą skontaktować

Numer kierunkowy ustawiany jest automatycznie po wyborze kraju

CZEGO POSZUKUJESZ?

Jeśli wybierzesz inne, opisz w polu uwagi

Jak możemy Ci pomóc?